Project Lisboa - Parque das Nações

Living Room
Living Room After
Living Room
Living Room After
Living Room
Living Room Before
Living Room
Living Room During
Living Room
Living Room
Living Room
Living Room
Living Room
Living Room After
Living Room
Living Room After
Living Room
Living Room After
Living Room
Living Room After
Living Room
Living Room
Living Room
Living Room
Living Room
Living Room After
Living Room
Living Room After
Living Room
Living Room Before
Living Room
Living Room After
Living Room
Living Room
Living Room
Living Room
Kitchen
Kitchen After
Kitchen
Kitchen After
Kitchen
Kitchen Before
Kitchen
Kitchen 3D
Kitchen
Kitchen
Kitchen
Kitchen
Kitchen
Kitchen After
Kitchen
Kitchen After
Kitchen
Kitchen Before
Kitchen
Kitchen During
Kitchen
Kitchen
Kitchen
Kitchen
Kitchen
Kitchen After
Kitchen
Kitchen After
Kitchen
Kitchen After
Kitchen
Kitchen After
Kitchen
Kitchen
Kitchen
Kitchen
Hall
Hall After
Hall
Hall After
Hall
Hall Before
Hall
Hall After
Hall
Hall
Hall
Hall
Social Bathroom
Social Bathroom After
Social Bathroom
Social Bathroom After
Social Bathroom
Social Bathroom Before
Social Bathroom
Social Bathroom After
Social Bathroom
Social Bathroom
Social Bathroom
Social Bathroom
Circulation
Circulation After
Circulation
Circulation After
Circulation
Circulation Before
Circulation
Circulation During
Circulation
Circulation
Circulation
Circulation
Circulation
Circulation After
Circulation
Circulation After
Circulation
Circulation After
Circulation
Circulation After
Circulation
Circulation
Circulation
Circulation
Suite
Suite After
Suite
Suite After
Suite
Suite Before
Suite
Suite After
Suite
Suite
Suite
Suite
Bathroom Suite
Bathroom Suite After
Bathroom Suite
Bathroom Suite After
Bathroom Suite
Bathroom Suite 3D
Bathroom Suite
Bathroom Suite After
Bathroom Suite
Bathroom Suite
Bathroom Suite
Bathroom Suite
Bathroom Suite
Bathroom Suite After
Bathroom Suite
Bathroom Suite After
Bathroom Suite
Bathroom Suite Before
Bathroom Suite
Bathroom Suite 3D
Bathroom Suite
Bathroom Suite
Bathroom Suite
Bathroom Suite
Bathroom Suite
Bathroom Suite After
Bathroom Suite
Bathroom Suite After
Bathroom Suite
Bathroom Suite Before
Bathroom Suite
Bathroom Suite During
Bathroom Suite
Bathroom Suite
Bathroom Suite
Bathroom Suite
Bathroom Shared
Bathroom Shared After
Bathroom Shared
Bathroom Shared After
Bathroom Shared
Bathroom Shared During
Bathroom Shared
Bathroom Shared After
Bathroom Shared
Bathroom Shared
Bathroom Shared
Bathroom Shared
Bathroom Shared
Bathroom Shared After
Bathroom Shared
Bathroom Shared After
Bathroom Shared
Bathroom Shared Before
Bathroom Shared
Bathroom Shared After
Bathroom Shared
Bathroom Shared
Bathroom Shared
Bathroom Shared
Bedroom 1
Bedroom 1 After
Bedroom 1
Bedroom 1 After
Bedroom 1
Bedroom 1 Before
Bedroom 1
Bedroom 1 After
Bedroom 1
Bedroom 1
Bedroom 1
Bedroom 1
Bedroom 2
Bedroom 2 After
Bedroom 2
Bedroom 2 After
Bedroom 2
Bedroom 2 Before
Bedroom 2
Bedroom 2 After
Bedroom 2
Bedroom 2
Bedroom 2
Bedroom 2
Bedroom 3
Bedroom 3 After
Bedroom 3
Bedroom 3 After
Bedroom 3
Bedroom 3 Before
Bedroom 3
Bedroom 3 After
Bedroom 3
Bedroom 3
Bedroom 3
Bedroom 3

Apartment T4
Structure: Reinforced concrete
Decade of construction: 2000
Intervention: Interiors Design,
Constrution,Planning,
Management and Execution
Work: Full refurbishment

Interior design Consultancy Planning, direction and execution of work
Our intervention

An excellent T4 apartment in a premium location in Parque das Nações, which was used but perfectly habitable, underwent an update, with a view to obtaining superior quality finishes.

This apartment was then complete refurbishment, including:

Changes to water and sewage networks (sanitary installations and kitchen); new coverings and equipment in Sanitary Facilities (sink furniture and walk-in shower) and in the Kitchen; new kitchen furniture; recovery and painting of skirting boards, doors, and trim; sanding and varnishing of wooden floors; full paintings.

We list some situations:

DEKTON's ceramic tile, cut to size - large format, 8 mm thick, ZENITH Series, was applied to the walls and floor of the shower areas in the Sanitary Facilities.

DEKTON ceramic flooring, cut to size, 8 mm thick, ALBARIUM Series, was applied to the Kitchen/Laundry floor.

Projecting spotlights from ONOK, TAB Ceiling series, were placed in the false ceilings.

Props were assembled to form a fixed divider in the room, made of natural wood, up to the ceiling and a wall covering was assembled (partition between the dining room and kitchen), including 2 doors for storage and a niche for recessing wine cellar, made of natural wood slats.

The result: a contemporary and sophisticated space.