Cascais 10
-
Living Room Floor 0 After
-
Living Room Floor 0 After
-
Living Room Floor 0 Before
-
Living Room Floor 0 After
-
Living Room Floor 0 After
-
Living Room Floor 0 After
-
Living Room Floor 0 Before
-
Living Room Floor 0 After
-
Living Room Floor 0 After
-
Living Room Floor 0 After
-
Living Room Floor 0 After
-
Living Room Floor 0 After
-
Kitchen Floor 0 After
-
Kitchen Floor 0 After
-
Kitchen Floor 0 After
-
Kitchen Floor 0 After
-
Kitchen Floor 0 After
-
Kitchen Floor 0 After
-
Kitchen Floor 0 After
-
Kitchen Floor 0 After
-
Kitchen Floor 0 After
-
Kitchen Floor 0 After
-
Kitchen Floor 0 After
-
Kitchen Floor 0 After
-
Stairs Floor 0 After
-
Stairs Floor 0 After
-
Stairs Floor 0 After
-
Stairs Floor 0 After
-
Social Bathroom Floor 0 After
-
Social Bathroom Floor 0 After
-
Social Bathroom Floor 0 After
-
Social Bathroom Floor 0 After
-
Suite 1 Floor 1 After
-
Suite 1 Floor 1 After
-
Suite 1 Floor 1 After
-
Suite 1 Floor 1 After
-
Suite 1 Bathroom Floor 1 After
-
Suite 1 Bathroom Floor 1 After
-
Suite 1 Bathroom Floor 1 After
-
Suite 1 Bathroom Floor 1 After
-
Suite 2 Floor 1 After
-
Suite 2 Floor 1 After
-
Suite 2 Floor 1 After
-
Suite 2 Floor 1 After
-
Suite 2 Bathroom Floor 1 After
-
Suite 2 Bathroom Floor 1 After
-
Suite 2 Bathroom Floor 1 After
-
Suite 2 Bathroom Floor 1 After
-
Suite 3 Floor 1 After
-
Suite 3 Floor 1 After
-
Suite 3 Floor 1 After
-
Suite 3 Floor 1 After
-
Suite 3 Floor 1 After
-
Suite 3 Floor 1 After
-
Suite 3 Floor 1 After
-
Suite 3 Floor 1 After
-
Suite 3 Bathroom Floor 1 After
-
Suite 3 Bathroom Floor 1 After
-
Suite 3 Bathroom Floor 1 After
-
Suite 3 Bathroom Floor 1 After
-
Suite 3 Bathroom Floor 1 After
-
Suite 3 Bathroom Floor 1 After
-
Suite 3 Bathroom Floor 1 After
-
Suite 3 Bathroom Floor 1 After
-
Bedroom 1 Basement After
-
Bedroom 1 Basement After
-
Bedroom 1 Basement After
-
Bedroom 1 Basement After
-
Shared Bathroom Basement After
-
Shared Bathroom Basement After
-
Shared Bathroom Basement After
-
Shared Bathroom Basement After
-
Cinema room Basement After
-
Cinema room Basement After
-
Cinema room Basement After
-
Cinema room Basement After
-
Cinema room Basement After
-
Cinema room Basement After
-
Cinema room Basement After
-
Cinema room Basement After
-
Outdoor After
-
Outdoor After
-
Outdoor After
-
Outdoor After
-
Outdoor After
-
Outdoor After
-
Outdoor After
-
Outdoor After
House V4
Structure: Reinforced concrete
Decade of construction: 2024
Intervention: Interiors Design,
Management and Execution
Our intervention
A villa with contemporary features, developed on 3 floors (Floor -1, Floor 0 and Floor 1), built in a premium area of Cobre-Cascais, in new condition, uninhabited, with good architecture, but which lacked, in the client's opinion, the FINAL TOUCH.
Thus, in the initial assumption of "carte blanche" we developed an interior design project that allowed us to leave our mark on this property.
This project, as usual, was formed from the stages of defining objectives, layout study, budget definition, choice of materials, tailor-made design (false ceilings, shelves and equipment) and accurate research in the market of pieces (furniture and decorative pieces).
On Floor -1 we highlight a fully equipped cinema room (projection screen, ambient sound, motorized blackout curtains), including a hidden bar inserted in custom-designed and manufactured furniture. On Floor 0, the living room space was improved, using the construction of a custom-made TV bench and a set of sofa, armchairs, Cassina table and wooden chairs); on the 1st floor, space of the 3 existing suites, bedroom environments were created with headboards, sideboards, rugs, blackout curtains, TVs, panels and wallpapers; Finally, outside (pool area) sofas/bed, pouf, parasol, vases and side table were integrated.
The result: an elegant but relaxed atmosphere, designed for leisure time.